+ 100% - Englishಕನ್ನಡ
Menu

About Us

Karnataka's pioneering spirit in the field of power has been translated into several major milestones. Established Asia’s first – Hydro Electric Power Station in Shivanasamudram, on the banks of river Cauvery during 1902. Karnataka the first to embark on Alternating current, when Bangalore Citys lighting scheme was completed. Karnataka had the longest transmission line in the world in 1902, from Shivanasamudram to KGF, covering a distance of 147 km and it was the first state in the country to conceive and set up a professionally managed Corporation to plan, construct, operate and maintain power generation projects in the state. Thats the legacy that KPCL started with and built on.

For over four decades, the Karnataka Power Corporation has been a prime mover and catalyst behind key power sector reforms in the state – measures that have spiralled steady growth witnessed in both industrial and economic areas. Right from the year of inception, in 1970, KPCL set its sights on "growth from within” meeting growing industry needs and reaching out to touch the lives of the common person, in many ways.

KPCL today has an installed capacity of 8846.305 MW (as on 31.12.2017) of hydel, thermal, solar and wind energy, with 6820 MW in the pipeline.

From an industry point, KPCL has raised the bar on the quality of deliverables and is constantly working at lowering the cost per megawatt – a commendable cost-value equation that has become a benchmark on the national grid. KPCL's stock in trade is industry proven – well-established infrastructure & modern, progressive management concepts and a commitment to excel, helping it meet the challenges of the rising energy demands of Karnataka.

The leverage point of KPCL initiatives are its resource management strengths – right across planning, financing and project engineering. KPCL also has a high rating in terms of project completion and commissioning within the implementation calendar.

Updated On:07.04.2018 12:53:20
By:admin