Kadra Dam Power House

KadraDamPSThe Kadra power house has been built on the left bank of the river with an installed capacity of 150 MW. The power house integrates three 50 MW Kaplan turbines which are coupled to the generating units. The annual generation is 570 MU. The design head is 32 metres.

Commissioned Dates
Unit 1 02-06-1997
Unit 2 23-01-1999
Unit 3 21-05-1999