Gerusoppa Hydro Electric Project

GerusoppaDam

The Power House on the right bank of the Gerusoppa dam consists of four Francis-type turbines coupled to the generating units of 60 MW each. The units are configured to operate at a design head of 47.5 mtrs. An outdoor switchyard is located between the toe of the dam and the power house. Power from the outdoor yard is evacuated through a 220 KV double circuit transmission line connected to the state grid at Talaguppa