Bellary Thermal Power Station Unit-III

Bellary Thermal Power Station Unit-III

Location: Kudatini, Bellary District. Karnataka State

STAGE

UNIT

CAPACITY

COMMISSIONED ON

III

3

700 MW (Super critical technology)

&Nbsp;

  • LOA placed on 28.09.2010 (EPC Contract)
  • Contractor: BEH
  • Capacity Addition achieved in March 2016.
  • COD achieved on 16.09.2016.

Reliability operation under progress.