KPCL’ s Record Achievements

  • Highest generation of 29784 million units (2014-2015)
  • Highest thermal generation of 18146 Million Units (2016-2017).
  • Highest Plant Load Factor of 90.39 % at Raichur Thermal Power Station (2002-2003).
  • Highest capacity addition of 1500 MW, in 2016-2017(BTPS unit #3 (700MW) YTPS unit #1 ()).
  • Commissioning of Unit – 7 at RTPS in 25 Months – A National record

Generation Performance

Generation 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
Thermal 12969 15853 16786 17573 18146 15852.01
Hydro + Wind Solar 10183 12860 12998 7403 6708 7056.65
Total 23152 28713 29784 24976 24854 22908.66

Performance of Major Hydro Stations

Year 2013-14 2014-15 2015-16 2016-17 2017-18
Power Stations % PAF % Aux Con % PAF % Aux Con % PAF % Aux Con % PAF % Aux Con % PAF % Aux Con
Sharavathi 92.84 1.15 92.73 1.14 84.62 1.18 68.2 0.66 90.37 0.89
Nagjhari 84.82 1.28 78.01 1.29 77.7 1.45 87.61 1.39 92.02 1.35
Varahi 99.49 2.24 97.59 2.35 84 2.31 90.07 2.92 93.74 2.62

Updated On:17.11.2018 05:04:38
By:EECSD