1Transportation of waste coal from Unit 1 & Unit 2 mill bay of YTPS23.03.202004.04.2020
2Inspection, testing, certification of lifting tools, tackles and pressure vessels as per factory act at Varahi Hydro Electric Project, Hosangadi, Kundapura Tq, Udupi Dist31.03.202013.04.2020
3“Special assistance for routine Maintenance works of Generator and auxiliaries Turbines and auxiliaries, ODY equipments at MGHE Power House for a period of one year.,Jog falls-577435,Shimoga-Dist,Karnataka”04.04.2020
4Works at BTPS27.03.202006.04.2020
5Works at BTPS27.03.202007.04.2020
6Periodical Special Assistance by External Agency for various Maintenance and operation works for a period of One year at Bhadra Generating Station, B.R. Project-577115, Shing, Karnataka20.03.202030.03.2020
7Periodical special assistance by external agency for carrying out Maintenance of Power Supply at BHEP Colony for a Period of One Year at B. R. Project- 57711520.03.202030.03.2020
8Periodical special assistance for preventive electrical maintenance of LT Motors and LT Switch gears in outlying areas of Units # 1 to 8 for a period of one year (2020-21) pertaining to EE(OLA)E division24.03.202002.04.2020
9Design, Engineering, Manufacturing, Quality surveillance, Testing at manufacture’s works, Packing, Supply, Delivery F.O.R Bidadi site, Erection, Testing, Commissioning and conducting performance guarantee tests with all civil, structural, mechanical, electrical, control & instrumentation works including Two years of Operation and Maintenance of 11.5MW Waste to Energy Plant at Bidadi Ramanagar dist. BENGALURU-562109.20.03.202021.04.2020
10PROCUREMENT OF LIGHTING MATERIALS AT YTPS24.03.202023.04.2020
11Providing Emergency 3-phase 415V AC supply through 500 KVA Portable DG-set @220kv ODY of VUGPH, Hosangadi, Kundapur(T), Udupi(D)23.03.202007.04.2020
12Rate contract work of Routine, preventive and Breakdown Maintenance of Mill reject handling system and Conveyor belt of size 600mm width of Unit- 5,6, &7 for a period of one year from date of work order.23.03.202030.03.2020
13Rate contract work of routine general/Preventive/breakdown maintenance works of XRP-803 / XRP-903 bowl mills, DPMRHS and their auxiliaries of Unit- 5 , 6,7 & 8 for a period of One year23.03.202030.03.2020
14Design, Engineering, Manufacturing, Quality surveillance, Testing at manufacture’s works, Packing, Supply, Delivery F.O.R Bidadi site, Erection, Testing, Commissioning and conducting performance guarantee tests with all civil, structural, mechanical, electrical, control & instrumentation works including Two years of Operation and Maintenance of 11.5MW Waste to Energy Plant at Bidadi Ramanagar dist. BENGALURU-562109.20.03.202021.04.2020
15Rare contract work of Replacement of eroded insulation cover plate assy., replacement / reconditioning of eroded mill side liner assembly, replacement of worm gear & shaft , servicing lube oil coolers /lube oil system, inspection of worm shaft thrust bearings etc., in bowl mills of unit-8 during annual overhaul 2019-20 (OH-3)23.03.202030.03.2020
16Rate contract work of Replacement of eroded mill outlet elbows, mill discharge valve assy, orifices etc., in bowl mills of unit – 8 during annual overhaul 2019 20 (OH-2)23.03.202030.03.2020
17Rate contract work of replacement of eroGdT-p. bend, fuel inlet elbows, line orifice etc., in bowl mills of unit8 during annual overhaul 2Ol9-20 (O.H-l)23.03.202030.03.2020
18Works at BTPS21.03.202001.04.2020
19PROCUREMENT OF OVERHAULING KITS FOR COMPRESSORS06.03.202007.04.2020
20PROCUREMENT OF LED MODULES FOR MOSAIC CONTROL PANELS AT YTPS20.03.202020.04.2020
21Dismantling, Erection, Testing and commissioning of Brake and Jack System at Ghataprabha Dam Power House for one unit20.03.202021.04.2020
22Renewal of License and Maintenance of Firewall for Network Security Systems at YCCPP premises, Yelahanka for one year20.03.202007.04.2020
23procurement of spares through btps purchase18.03.202016.04.2020
24Providing periodical special assistance by external agency for outsourcing of various maintenance works at Gerusoppa Power House for a period of one year19.03.202027.03.2020
25Operation and Maintenance of 2X1.2 MW Malaprabha Mini Hydel Plant (MMHP), Saundatti, Belagavi Dist., for a period of 1 (One) Year17.03.202001.01.2020
26Desilting of Maralihalla pump house by under water diving services for the year 2020-2118.03.202026.03.2020
27Annual maintenance of NDCT-1,2 &3 inside BTPS for the year 2020-2118.03.202026.03.2020
28e-Procurement of SPARES TO RTPS16.03.202016.04.2020
29Rewiring of non residential buildings at Hosangdi, Kundapura(T), Udupi(D)16.03.202030.03.2020
30PROCUREMENT OF VARIOUS HAND TAPS SETS FOR YTPS27.02.202024.03.2020
31PROCUREMENT OF COPPER CABLES27.02.202026.03.2020
32PROCUREMENT OF ELECTROMAGNETIC RELAYS FOR YTPS27.02.202017.03.2020
33PROCUREMENT OF 60W FLAME PROOF LED FITTINGS FOR YTPS25.02.202024.03.2020
34PROCUREMENT OF AIR MOTOR FOR AIR PRE-HEATERS AT YTPS05.03.202007.04.2020
35Maintenance of Power Supply works in Jog & MGHE colonies including Valve House, Vodenbyle, Trolley House, Fore bay area through external agency for a period of one year.12.03.202021.03.2020
36PROCUREMENT OF ROTARY CAM SELECTOR SWITCHES FOR YTPS13.03.202013.04.2020
37PROCUREMENT OF SPARES FOR SLUICE VALVE16.03.202016.04.2020
38PROCUREMENT OF ACID UNLOADING PUMP16.03.202016.04.2020
39PROCUREMENT OF VALVES FOR BOWL MILLS/REJECT HANDLING SYSTEM AT YTPS05.03.202007.04.2020
40PROCUREMENT OF VARIOUS TYPES OF MICRO BORING SPARES14.03.202014.04.2020
41Works at BTPS10.03.202024.03.2020
42Works at BTPS13.03.202021.03.2020
43SUPPLY OF SPARES TO RTPS VIDE E-PORTAL- REG03.03.202007.04.2020
44Maintenance of HT lines from Ambewadi to NPH via Dandeli, Kulgi, Ambikanagar, Sykes point, HT lines from Kulgi to Tattihalla dam via Intake, BP dam and LT lines in Ambikanagar colony & work sites12.03.202020.03.2020
45De-erection of failed Induction Generator, Erection and Commissioning of Good conditioned 225KW Wind Energy Generator (Supplied by KPCL) at Kappatagudda Wind Energy Farm Stage-I, KPCL, Gadag, Karnataka covering all associated works and components required for successful completion of the work12.03.202027.03.2020
46Dismantling of existing 33 KV VCB breaker Make: M/S Alstom and Supply, installation, Testing & Commissioning of one No. of 33KV SF6 Breaker of make M/S CGL/ M/S SIEMENS OR EQUIVALENT at Kappatagudda Wind Energy Farm Stage-II, KPCL, Gadag, Karnataka05.03.202023.03.2020
47Providing 11KV Aerial Bunched cable for 3 nos of transformer centers at Ambikanagar19.02.202021.03.2020
48WORKS AT BTPS10.03.202026.03.2020
49Procurement of spares at BTPS11.03.202031.03.2020
50Works at BTPS10.03.202019.03.2020
51Carrying out of Round the Clock Monitoring, Routine, Preventive, Break down maintenance of Air Condition low side equipment’s (except chiller units), ventilation system such as Air washer Units, Fresh Air Supply, Exhaust fan, Roof Extraction Fan System & Comprehensive maintenance of Split Ac’s, window Ac’s, Ductable Ac’s, Packaged Ac’s from 1Tr to 15TR installed in unit 1, 2 & 3 @ BTPS”10.03.202021.03.2020
52Repairing of MV SV Lamp fittings from Railway gate to Unit 8 Bunker, Tower lights at Marshalling yard, coal stock yard, servicing of lighting equipments, Industrial type welding supply points and Replacing of faulty lighting cables in CHP 1 and 2 area for a period of 1 year11.03.202021.03.2020
53Preventive, Breakdown and Routine Maintenance of Electrical Equipments in CHP-111.03.202021.03.2020
54Carrying out preventive maintenance, breakdown maintenance and annual overhauling works of 415V LT system located at Fire Water Pump House, DM Plant, RODM, FOPH, CWPH, Clarifier, CPU, Ozonisation, Raw Water PT plant, Raw Water Pump House, ETP, PTP, Decanting Pump House, Ash Slurry pump house, Vacuum Pump House, Ash water Recovery Pump House, Ash water recovery PT Clarifier Pump House & SILO utility MCC comprising Switchgear, motors & its associated control panel, Battery banks and cables of 2 X 500MW Unit 1 & 2 and 1X700MW Unit 3 at BTPS, Kudathini for a period of one year (2020-21).10.03.202021.03.2020
55collection loading transportation unloading of mill rejects and misellenious works at unit 1 ,2&3 for one year09.03.202024.03.2020
56Carrying out preventive maintenance, breakdown maintenance and annual overhauling works of 415V LT system located at power house and ESP along with connected control panel and motors of 2 X 500MW Unit 1 & 2 and 1X700MW Unit 3 at BTPS, Kudathini for a period of one year (2020-21)”.09.03.202021.03.2020
57Routine, Preventive & Breakdown Maintenance of electrical equipments in CHP-210.03.202019.03.2020
58Procurement of spares at BTPS10.03.202024.03.2020
59Works at BTPS07.03.202021.03.2020
60Periodical special assistance for preventive electrical maintenance of LT Motors and LT Switchgears in outlying areas of Units # 1 to 8 for a period of one year (2020-21) pertaining to EE(OLA)E division10.03.202019.03.2020
61Periodical special assistance for breakdown / preventive maintenance and Overhauling of Generator & Its Auxiliaries, Generator control & protection systems, DAVR, Generator Control & Common Auxiliary Desk Panels, Batteries & Battery chargers of Units -1 to 8, Variable Frequency Drives for ID Fans of Unit-5, 6 & 8, 220KV and 400 KV Switch yard controls & Relay panels and Marshalling Kiosks for a period of one year” at RTPS09.03.202018.03.2020
62Providing and Fixing Name Boards to Building/ Components of Units inside BTPS Plant,Kuditini Bellary”09.03.202027.03.2020
63Procurement of spares through btps purchage.07.03.202007.04.2020
64Rate contract work of Routine, Preventive and Breakdown Maintenance of Mill reject handling system and Conveyor belt of size 600mm width of Unit- 5,6, &7 for a period of one year from date of work order07.03.202019.03.2020
65Rate contract work of routine general/Preventive/breakdown maintenance works of XRP-803/ XRP-903 bowl mills, DPMRHS and their auxiliaries of Unit- 5 , 6, 7 & 8 for a period of One year07.03.202019.03.2020
66Rate contract work of Replacement of eroded insulation cover plate assy., replacement / reconditioning of eroded mill side liner assembly, replacement of worm gear & shaft , servicing lube oil coolers /lube oil system, inspection of worm shaft thrust bearings etc., in bowl mills of unit- 8 during annual overhaul 2019-20 (OH-3).07.03.202019.03.2020
67Rate contract work of Replacement of eroded mill outlet elbows, mill discharge valve assy, orifices etc., in bowl mills of unit – 8 during annual overhaul 2019 -20 (OH-2)07.03.202019.03.2020
68Rate contract work of replacement of eroded P.F. bend, fuel inlet elbows, line orifice etc., in bowl mills of unit- 8 during annual overhaul 2019-20 (O.H-1)07.03.202019.03.2020
69procurement of spares through Btps purchase07.03.202021.03.2020
70Replacement of Belleville springs of 5 Nos. Nozzles of 2nd stage Units with new design Helical springs and rectification of Nozzles at Varahi Underground Power House, Hosangadi, Kundapura tq. Udupi dist. Karnataka-Call-206.03.202021.03.2020
71Procurement of spares through btps purchage.06.03.202027.03.2020
72Housekeeping of generating station, pumphouse, control rooms and allied buildings of Unit-3 at BTPS for the year 2020-2104.03.202012.03.2020
73Housekeeping of generating station, pumphouse, control rooms and allied buildings of Unit-2 at BTPS for the year 2020-21.29.02.202016.03.2020
74Housekeeping of generating station, pumphouse, control rooms and allied buildings of Unit-1 at BTPS for the year 2020-21.03.03.202016.03.2020
75Housekeeping of Technical building, ED Block, HRD Block & Canteen, post office, Main gate & material gate etc., at BTPS for the year 2020-2104.03.202012.03.2020
76Annual maintenance of NDCT-1,2 &3 inside BTPS for the year 2020-2129.02.202016.03.2020
77Annual maintenance of NDCT-1,2 &3 inside BTPS for the year 2020-2129.02.202016.03.2020
78Desilting of Maralihalla pump house by under water diving services for the year 2020-2129.02.202016.03.2020
79Procurement of spares through btps purchage e-portal03.03.202007.04.2020
80Works at BTPS04.03.202019.03.2020
81Works at BTPS04.03.202020.03.2020
82Design, supply, installation, testing & commissioning (After dismantling the existing CO2 system) of new CO2 system for Generator fire protection at Nagjhari Power House27.02.202027.03.2020
831) Two Nos. of (Type- Diesel) 8+1 seater, for 1500 kms per month & on 12 hours. duty basis (daily) [Engine-1800CC to 3000 CC] like Mahindra Bolero/ Mahindra XUV500/ Fortuner, Tavera, Tata sumo, CRV, TATA Safari, Grand Vitara (GPS fitted vehicle) with Driver, Fuel And Lubricants (POL) on hire basis for office duties of EE(C)Nagjhari-Colony & EE(PS&C)N [Ambikanagar] of model 2020 for a period of two years (extendable by one more year on the performance of the agency and condition of the vehicle). 2) One No. of (Type- Diesel) 8+1 seater for 2000 kms per month & 12 Hrs duty basis (daily) [Engine-1800CC to 3000 CC] like Mahindra Bolero/ Mahindra XUV500/ Fortuner, Tavera, Tata sumo, CRV, TATA Safari, Grand Vitara (GPS fitted vehicle) with Driver, Fuel And Lubricants (POL) on hire basis for office duties of EE(C)Supa [Ganeshgudi] of model 2020 for a period of 2 years (extendable by one more year on the performance of the agency and condition of the vehicle).26.02.202027.03.2020
84Refilling of SF6 gas to various KPCL projects in empty cylinders of 50/25 Kgs capacity (empty cylinders to be supplied by KPCL) for a period of two years29.02.202031.03.2020
85providing canteen facility at masthikatte office complex of Varahi Hydro Electric project for a period of two years02.03.202014.03.2020