Sl no.TitleIssue Dateclose Date
1procurement of spares through BTPS29.01.202002.03.2020
2Assisting work in day to day activities of EE(MSP)K division for a period of 65 days.28.01.202004.02.2020
3PROCUREMENT OF SECONDARY ISOLATION CONTACT & CRANKING NUT HOLDER FOR YTPS30.01.202028.02.2020
4PROCUREMENT OF OIL TESTING BDV KIT30.01.202028.02.2020
5PROCUREMENT OF AIR MOTOR FOR AIR PRE-HEATERS AT YTPS29.01.202028.02.2020
6PROCUREMENT OF INDUSTRIAL TOOLS FOR YTPS29.01.202025.02.2020
7PROOCUREMENT OF COPPER CABLES FOR YTPS29.01.202025.02.2020
8PROCUREMENT OF VALVES FOR BOWL MILLS/REJECT HANDLING SYSTEM AT YTPS25.01.202013.02.2020
9PROCUREMENT OF SWITCH FUSE UNITS FOR YTPS28.01.202025.02.2020
10procurement of spares through BTPS22.01.202024.02.2020
11procurement for spares through BTPS22.01.202024.02.2020
12SUPPLY OF SPARES TO RTPS VIDE E-PORTAL-REG24.01.202024.02.2020
13procurement of spares through BTPS Purchase18.01.202028.02.2020
14SUPPLY OF 192 PAIRS OF SAFETY SHOES OF VARIOUS SIZES WITH ISI MARK REQUIRED FOR KHEP-I & GDPH EMPLOYEES FOR THE YEAR 202024.01.202015.02.2020
15procurement of spares through BTPS Purchase10.01.202021.02.2020
16Replacement of wire rope of gate no. 4 & 5 and control panel of seven radial gates at Bommanhalli dam. & Supply, installation, commissioning and testing of control panel for two Penstock gates of Supa Dam.21.01.202018.02.2020
17PROCUREMENT OF TOOLS FOR BOILER MAINTENANCE WORKS21.01.202020.02.2020
18Design, engineering, manufacture, quality surveillance, testing at works, supply, transportation to site, storage at site, local intra-site transportation, erection, testing and commissioning, performance guarantee tests and handing over of one No. of VIP lift of 680Kgs/ 10 Passengers capacity of Unit-4 and one No. of Freight lift of 1500Kgs capacity of Unit-5&6 including dismantling and Buyback of existing lifts, civil and electrical works, certification etc.,21.01.202004.02.2020
19PROCUREMENT OF SPARES FOR AIR PREHEATER21.01.202004.02.2020
20PROCUREMENT OF CHAIN PULLEY BLOCKS FOR YTPS21.01.202018.02.2020
21PROCUREMENT OF INSULATION MATTRESS FOR YTPS21.01.202020.02.2020
22Replacement of two numbers of existing condenser water pumps by Kirloskar make pumps/equivalent pumps for unit -7 AC system18.01.202027.01.2020
23PROCUREMENT OF RAW WATER JACKWELL PUMPS FOR YTPS20.01.202018.02.2020
24PROCUREMENT OF SPARES FOR ASH WATER RECOVERY PUMPS FOR YTPS20.01.202018.02.2020
25Re-insulation/ rewinding, testing and Supervision during commissioning of 225KW Induction Generator(dual wound) at Kappatagudda Wind Energy Farm Stage, KPCL, Gadag, Karnataka – Corrigendum18.01.202027.01.2020
26PROCUREMENT OF COMPRESSOR SPARES FOR YTPS20.01.202018.02.2020
27Replacement of Belleville springs of 5 Nos. Nozzles of 2nd stage Units with new design Helical springs and rectification of Nozzles at Varahi Underground Power House, Hosangadi, Kundapura tq18.01.202003.02.2020
28Major repair of radial gate No1 & 4 including other related works of Tattihalla dam.17.01.202025.01.2020
29SUPPLY OF SPARES TO RTPS VIDE E-PORTAL-REG11.01.202013.02.2020
30PROCUREMENT OF SPARES FOR SLEEVE COUPLINGS OF ASH HANDLING SYSTEM16.01.202015.02.2020
31procurement of spares through BTPS14.01.202015.02.2020
32PROCUREMENT OF NOMEX BAG FILTERS FOR ASH HANDLING SYSTEM AT YTPS16.01.202011.02.2020
33Re-insulation/ rewinding, testing and Supervision during commissioning of 225KW Induction Generator(dual wound) at Kappatagudda Wind Energy Farm Stage, KPCL, Gadag, Karnataka16.01.202027.01.2020
34PROCUREMENT OF 60W FLAME PROOF LED FITTINGS FOR YTPS14.01.202010.02.2020
35PROCUREMENT OF SPARES FOR SCREW COMPRESSORS10.01.202010.02.2020
36PROCUREMENT OF ELECTROMAGNETIC RELAYS FOR YTPS10.01.202010.02.2020
37PROCUREMENT OF VARIOUS HAND TAPS SETS FOR YTPS13.01.202011.02.2020
38PROCUREMENT OF OVERHAULING KITS FOR COMPRESSORS16.01.202014.02.2020
39PROCUREMENT OF 120W SLED STREET LIGHT FITTINGS FOR YTPS13.01.202010.02.2020
40procurement of spares through BTPS31.01.202031.01.2020
41procurement of300KL of LDO by road tankers of BTPS17.01.202020.01.2020
42procurement of spares through BTPS03.01.202029.01.2020
43Dismantling of existing 33 KV VCB breaker Make: M/S Alstom and Supply, installation, Testing & Commissioning of one No. of 33KV SF6 Breaker of make M/S CGL/ M/S SIEMENS OR EQUIVALENT at Kappatagudda Wind Energy Farm Stage-II, KPCL, Gadag, Karnataka10.01.202010.02.2020
44Procurement of SPARES TO RTPS03.01.202010.02.2020
45Procurement of spares at BTPS24.12.201924.01.2020
46procurement of spares through BTPS24.12.201924.01.2020
47procurement for spares to BTPS/KPCL23.12.201927.01.2020
48procurement for spares to BTPS/KPCL26.12.201927.01.2020
49Replacement of two numbers of existing condenser water pumps by Kirloskar make pumps/equivalent pumps for unit -7 AC system07.01.202014.01.2020
50Supply, Installation, Testing, commissioning Of new 750 KVA DG Set with acoustic enclosure & AMF panel under buyback scheme at Nagjhari Power House07.01.202008.02.2020
51Replacement of 2150mm Rotary valve main seal of Unit-6 at Nagjhari Power House – Call-201.01.202008.01.2020
52Providing track Illumination to ODPH oil unloading area inside YTPS30.12.201908.01.2020
53Erection/testing & commissioning of 1 No. of 20 mtrs height High Mast at SILO Weigh bridge and Providing power supply & Illumination to Chemical Storage Shed and modification of LM towers electrical circuit at 400KV switch yard inside YTPS.30.12.201908.01.2020
54Emergency power supply maintenance works at 11KV substation, Office buildings, AAQMS points, street lights and LT switchgear control panels for a period of 3 months at YTPS30.12.201908.01.2020
55Comprehensive Annual Maintenance Contract for Desktop PC’s and Printers for one year (2020)” at Raichur Thermal Power Station, Shakthinagar, Raichur District, Karnataka State, Pin code – 584 17006.01.202013.01.2020
56Providing 100Mbps Internet (1:1) Lease Line connectivity to Bellary Thermal Power Station(BTPS), Kudutini & 20Mbps Internet (1:1) Lease Line connectivity to Munirabad Dam Power House(MDPH), Munirabad03.01.202010.01.2020
57SUPPLY OF SPARES TO RTPS VIDE E-PORTAL-REG26.12.201904.02.2020
58Major repair of radial gate No1 & 4 including other related works of Tattihalla dam.02.01.202009.01.2020
59PROCUREMENT OF SPARE NUMERICAL RELAYS FOR YTPS26.12.201928.01.2020
60PROCUREMENT OF SWITCH FUSE UNITS FOR YTPS27.12.201921.01.2020
61PROCUREMENT OF ILLUMINATION FOR YTPS27.12.201921.01.2020
62PROCUREMENT OF WELDING GENERATOR FOR YTPS-CALL-326.12.201928.01.2020
63PROCUREMENT OF TRANSFORMER FILTER TROLLEY TYPE27.12.201928.01.2020
64PROCUREMENT OF COAL PROCESSING EQUIPMENTS28.12.201927.01.2020
65Design, Engineering, Manufacturing, Quality surveillance, Testing at manufacture’s works, Packing, Supply, Delivery F.O.R Bidadi site, Erection, Testing, Commissioning and conducting performance guarantee tests with all civil, structural, mechanical electrical, control & instrumentation works including Two years of Operation and Maintenance of 11.5MW Waste to Energy Plant at Bidadi Ramanagar dist. BENGALURU-56210928.12.201927.01.2020