Sl no.TitleIssue Dateclose Date
1SUPPLY OF SPARES TO RTPS VIDE E-PORTAL-REG19.12.201920.01.2020
2carrying out “Regular Environmental Quality Monitoring” at BTPS27.12.201927.01.2020
3Supply & Installation of CCTVs for all entrance gates & critical areas at BTPS27.12.201913.01.2020
4Supply of one No. of Gear Box assembly with forced lubrication system as per enclosed technical specification for unit-1 at MMHP14.12.201927.12.2019
5Providing Excavator, clearing of hopper shales stones, chokages and Transportation of collected stones to the designated place at YTPS24.12.201931.12.2019
6PROCUREMENT OF SPARES FOR HYDRAULIC SYSTEM OF STACKER CUM RECLAIMER26.12.201928.01.2020
7Providing of One No. of Maruthi-Swift Dzire/ Fiat-Punto EVO/ Tata-Manza/ Tata Zest/ Hyundai-Xcent/ Honda-Amaze/ Chevorlet –Sail/ Toyota –Etios on hire basis for office duties of Chief Engineer (O&M) Kali, KPCL, Ambikanagar, A/C car of 3+1 seater with GPS (with engine capacity 1190cc to 1290cc) (Type- Diesel) of model 2019 December and above for a period of two years (Extendable by one more year on the performance of the agency and condition of the vehicle) 2500 kms/ month, general duties.19.12.201917.01.2020
8PROCUREMENT OF WELDING GENERATOR FOR YTPS26.12.201928.01.2020
9PROCUREMENT OF SPARE NUMERICAL RELAYS FOR YTPS26.12.201928.01.2020
10Procurement of spares at BTPS24.12.201921.01.2020
11Providing 100Mbps Internet (1:1) Lease Line connectivity to Bellary Thermal Power Station(BTPS), Kudutini & 20Mbps Internet (1:1) Lease Line connectivity to Munirabad Dam Power House(MDPH), Munirabad01.01.202030.12.2019
12Procurement of spares to BTPS21.12.201920.01.2020
13Procurement of 300KL of LDO by Road tankers for BTPS23.12.201906.01.2020
14PROCUREMENT OF SPARES FOR AIR PREHEATER20.12.201921.01.2020
15SUPPLY OF SPARES TO RTPS VIDE E-PORTAL- REG09.12.201914.02.2020
16Replacement of two numbers of existing condenser water pumps by Kirloskar make pumps/equivalent pumps for unit -7 AC system”17.12.201902.01.2020
17Supply ,installation and commissioning of 82.5KVA DG set under buy back system at Jackwell, Hosangadi, Kundapura(T), Udupi (D)19.12.201903.01.2020
18Hiring of GPS fitted vehicles on hire basis to YCCPP Project for a period of Two years. (Extendable by one more year on the performance of the agency and condition of the vehicle18.12.201903.01.2020
19PROCUREMENT OF CARBON BRUSHES & BRUSH HOLDERS FOR 800 MW GENERATORS AT YTPS18.12.201913.01.2020
20PROCUREMENT OF HYDROCHLORIC ACID18.12.201913.01.2020
21PROCUREMENT OF TOOLS REQUIRED FOR AHP AT YTPS17.12.201913.01.2020
22PROCUREMENT OF SPARES FOR ASH WATER RECOVERY PUMPS FOR YTPS13.12.201913.01.2020
23PROCUREMENT OF RAW WATER JACKWELL PUMPS FOR YTPS13.12.201913.01.2020
24PROCUREMENT OF INSULATION MATTRESSES FOR YTPS12.12.201913.01.2020
25PROCUREMENT OF COMPRESSOR SPARES FOR YTPS17.12.201913.01.2020
26PROCUREMENT OF MSRL PIPES FOR ACID HANDLING SYSTEM12.12.201913.01.2020
27Annual Overhauling of LT Switch Gear and Motors in outlying areas of Unit # 1 to 8 and AHP Unit # 8 pertaining to EE(OLA)E for the year 2019-2005.12.201904.01.2020
28PROCUREMENT OF CONSUMABLES/TOOLS/VALVES17.12.201916.01.2020
29Bid notification dated 11/12/201911.12.201914.01.2020
30CORRIGENDUM-II, ISSUED FOR IMPLEMENTATION OF FGD SYSTEM AT YERAMARUS TPS12.12.201927.12.2019
31CORRIGENDUM-II, ISSUED FOR IMPLEMENTATION OF FGD SYSTEM AT RAICHUR TPS13.12.201931.12.2019
32procurement of acw bearings14.12.201916.01.2020
33PROCUREMENT OF DM WATER FOR COMMISSIONING ACTIVITIES OF YCCPP12.12.201920.12.2019
34PROCUREMENT OF OVER HAULING KITS FOR ELGI COMPRESSOR OF CHP.12.12.201902.01.2020
35PROCUREMENT OF HPSV LAMPS12.12.201910.01.2020
36Supply of 200W LED flood lights for high mast at Ambikanagar as per enclosed technical specification of make: Wipro/ Bajaj/ Havel/ Lokozo/ Philips/ CGL/ Halonix/ Osram/ GE/ Surya etc.02.12.201902.01.2020
37Procurement of Spare for BTPS10.12.201920.12.2019
38Major repair of radial gate No 1 & 4 including other related works of Tattihalla dam.10.12.201924.12.2019
39:- Releasing of brakes of loaded wagons, cutting, coupling, formation of empty wagons and Assistance to loco operators round the clock at CHP Unit-3 for a period of 3 months. – Revised Dates & Time – reg.06.12.201926.12.2019
40procurement of spares to BTPS07.12.201931.12.2019
41procurement of spares for BTPS10.12.201931.12.2019
42PROCUREMENT OF 33KV POTENTIAL TRANSFORMER06.12.201902.01.2020
43Refilling of R134a & R22 Refrigerant at BTPS, Kudathini, Ballari05.12.201920.12.2019
44Annual Maintenance of high mast lighting systems installed at Ambikanagar & Dam sites.03.12.201917.12.2019
45AMC of Lifts of M/s. KONE Elevators & M/s City Lifts installed @ U#1, 2 & 3 BTPS for a period of 06 months.05.12.201904.01.2020
46procurement of spares through btps e-portal04.12.201902.01.2020
47PROCUREMENT OF TELESCOPIC ALUMINIUM LADDER04.12.201926.12.2019
48PROCUREMENT OF PLATFORM & CYLINDER TROLLY04.12.201926.12.2019
49PROCUREMENT OF MAINTENANCE TOOLS OF BEARING PULLER, WELDING M/C…02.12.201926.12.2019
50PROCUREMENT OF GENERAL CONSUMABLES FOR YTPS03.12.201926.12.2019
51PROCUREMENT OF PAINTS AND LADDERS02.12.201926.12.2019
52PROCUREMENT OF LUBE OIL FILTERS FOR MAIN TURBINE02.12.201926.12.2019
53PROCUREMENT OF MULTIMETER AND TACHOMETER03.12.201926.12.2019
54PROCUREMENT OF AIR BLOWERS AND DIGITAL MULTIMETERS23.11.201926.12.2019
55Providing, Erection & Commissioning for 02 no. of Induced Draft, Fan less, Fill less FRP Cooling Tower for U#2 TG & ESP Centralized AC system @ BTPS03.12.201918.12.2019
56Procurement of spares to BTPS28.11.201927.12.2019
57Procurement of spares to BTPS through e-portal27.11.201919.12.2019