Sl no.TitleIssue Dateclose Date
1Hiring 3 (Three) Nos. of new Tata sumo/ equivalent 7(6+1) seater non-a/c diesel vehicles of 2019 onwards model with drivers for KPCL duty (24 hours availability) on monthly hire basis for a period two years and extendable for one more year for Varahi Hydro Electric Project30.01.201919.02.2019
2110 PAIRS OF DIFFERENT SIZE INDUSTRIAL SAFETY SHOES and 35 PAIRS OF LEATHER SHOES FOR EMPLOYEES OF VARAHI HYDRO ELECTRIC PROJECT, HOSANGADI – 576 28201.02.201920.02.2019
3Notice inviting bids from Practicing Company Secretary/ Firm of Company Secretaries for one year extendable by another one year for carrying out Secretarial Audit of Raichur Power Corporation Limited from Financial Year 2018-19 onwards.31.01.201918.02.2019
4Enquiry: Procurement of Vacuum pump oil and Servo gem 3 grease for YTPS29.04.201922.05.2019
5Design, Build, Operate and Transfer (DBOT) of 5MW Waste to Energy Project scalable upto 15MW capacity at Bidadi, Ramanagara Dist., near Bangalore29.01.201929.03.2019
6supply of 3 nos. Safety valves for OPU air-oil receiver tanks required at VUGPH Hosangadi from manufacturers / authorized suppliers30.01.201927.02.2019
7Supply of one set of Hydraulic Torque Wrench with accessories upto torque capacity of 14000Nm for Varahi Hydro Electric Project, Hosangadi-576 28225.02.201923.02.2019
8SUPPLY OF SPARES TO RTPS VIDE E-PORTAL- REG28.01.201902.04.2019
9Providing Security services of Civil security guards without arms for Bidadi Combined Cycle Power Plant, Bidadi, Ramanagara District for a period of 24 calendar months28.01.201918.02.2019
10Design, Engineering, Supply, erection, testing & commissioning of 1 Nos. of LVRT compatible 1000kW inverters of reputed make in place of faulty inverters along with remote SCADA system at 3 MW Solar PV Plant, Itnal Village, Chikkodi Taluk, Belagavi District24.01.201925.02.2019
11SHORT TERM TENDER For the work-“Dismantling & releasing of existing battery banks and Design, Engineering, Manufacture, Supply, installation Testing & Commissioning of 02 sets of new battery banks (each battery bank shall consist of 182 OPzS type cells) of 405V/700 AH capacity Battery banks with all accessories and necessary spares to retrofit the existing 02 sets of 405V/700 AH capacity HDL type Lead Acid battery banks with buy back arrangement for Uni-8 “ at RTPS.- reg.25.01.201911.02.2019
12Design, Engineering, Supply, erection, testing & commissioning of 1 Nos. of LVRT compatible 1000kW inverters of reputed make in place of faulty inverters along with remote SCADA system at 3 MW Solar PV Plant, Itnal Village, Chikkodi Taluk, Belagavi District24.01.201925.02.2019
13Supply of 200 mtrs. 1.1 kV class single core flexible copper conductor HR PVC type ‘C’ FR-LSH 300 sq.mm cable for Sharavathy Generating Station, KPCL, Jogfalls – 57743514.01.201916.02.2019
14Supply of 3 nos. of 24kV, 12500 Amps, LV Bushings for SGS, KPCL, Jogfalls – 577435.14.01.201905.02.2019
15Supply of 12 nos.110kV Capacitor Voltage Transformers for Linganamakki Power House, KPCL, Jogfalls.14.01.201905.02.2019
16Procurement of spares to BTPS through e-portal21.01.201921.02.2019
17Jungle clearance, Bond stone fixing & Trenching for landmarking of green belt area in BTPS”-(Reserved for SC)21.01.201902.02.2019
18procurement of spares through Btps17.01.201919.02.2019
19procurement of spares through Btps21.01.201915.02.2019
20Procurement of spares through btps purchage.19.01.201918.02.2019
21Design, Engineering, Manufacture, Supply, Retrofit, Testing and Commissioning of 246Nos. of Microprocessor based 0.2S Class ABT (Availability Based Tariff) feature Tri-vector Energy Meter having DLMS protocol along with Energy Management System (EMS) and networking, communication for Nagjhari, Supa, Staff, Kodasalli, Gerusoppa, MGHE, Varahi, Hands, Bhadra, Ghataprabha, Almatti, Shivasamudram and Shimsha Power Houses of KPCL18.01.201918.02.2019
22Replacement of existing water supply line from Kuduthini meeting hall to Thimmalapur office block -1 and 2 at BTPS”-(Reserved for SC)16.01.201928.01.2019
23Construction of Security room in North gate road entrance inside BTPS16.01.201928.01.2019
24Providing and laying of fly ash concrete in RO, PT, Clarifaculator etc and South side of mill bunker area of Unit-1 and Ash handling PLC area of Unit-2 in BTPS16.01.201928.01.2019
25Providing fixing aluminium partition to stores of Unit-3 and other various office in BTPS-(Reserved for SC)16.01.201928.01.2019
26Procurement of spares to BTPS18.01.201915.02.2019
27Enquiry : Procurement of PPEs for YTPS18.01.201914.02.2019
28Enquiry :Procurement of Pedestal Fan & Wall mounted fan for YTPS18.01.201914.02.2019
29Supply, testing and commissioning of two Nos. oil filter machines for Shiva Generating Station17.01.201916.02.2019
30Periodical assistance for various material handling works in YCCPP stores for a period of twelve months16.01.201915.02.2019
31supply, Erection, testing and commissioning of 1lOKV Isolator in Out Door yard at Mani Dam Power House, Hosanagara Tq., Shivamogga dist.09.01.201911.02.2019
32“Carry out the operation and monitoring work of Mani Dam Power House auxiliaries and a$sets complete.”09.01.201909.02.2019
33Cutting and removing Apu/ Jondu from marshy areas or cutting and removing grass/small bushes from switch yard/other similar locations including re-spreading aggregates, disposing of materials etc.,complete with all leads and lifts at 400/220KV switchyard & 11KV MUSS at Bellary Thermal Power station11.01.201930.01.2019
34providing two nos. of new M&M Bolero/ Equivalent 9(8+1) Seater, Non-A/c, Diesel vehicles of 2019 onwards model along with drivers for KPCL duty (24 hours availability) on monthly hire basis for a period of two years and extendable for One more year subjected to satisfactory contract execution, for Varahi Hydro Electric Project (Power House/Office), Hosangadi, Kundapura taluk,Udupi Dist-576282.10.01.201923.01.2019
35Enquiry : Procurement of hexa head bolt for MM11.01.201906.02.2019
36Construction of safe and wider steps on left bank for public to carry out annual festivals / bathing in River near Shiva Anicut Head works.08.01.201906.02.2019
37Construction of Ground Level Service Reservoir and Providing & laying of pipe lines for water distribution to colony in Shivasamudram HEP08.01.201906.02.2019
38Supply, Installation, testing and commissioning of AC LDB’s and MDB’s at Sharavathy Generating Station08.01.201923.01.2019
39Supply and Installation of Hydraulic servomotors for Governor system of Turbines of MGHE project, Jog falls-577 435, Shing – Dist, Karnataka07.01.201910.01.2019
40Replacement of damaged cooling water outlet pipeline and Siphon system pipeline of 2MW Left Bank Unit at Bhadra Generating Station, B.R.Project – 577115, Shing- Dist, Karnataka.04.01.201918.01.2019
41Procurement of spares to BTPS31.12.201829.01.2019
42Jungle clearance, Bond stone fixing & Trenching for landmarking of green belt area in BTPS”-(Reserved for SC)04.01.201904.02.2019
43Removing, cleaning, rectification of damaged HDPE downtake pipe at power house of unit-1 & 2 at BTPS-(Reserved for ST)05.01.201904.02.2019
44IMPORT AND SUPPLY OF COAL FOR YERMARUS THERMAL POWER STATION (YTPS) AND KPCL POWER PLANTS (RTPS & BTPS), KARNATAKA07.01.201921.01.2019
45“Renovation of existing toilets in Unit-1 & 2 Powerhouse and ESP control rooms at BTPS04.01.201904.02.2019
46Construction of damaged portion of 206W road near switch yard control room Unit-3 inside BTPS”04.01.201905.02.2019
47Replacement of damaged service water pipeline in Technical Building & other works at BTPS04.01.201905.02.2019
48Supply of Fasteners for CHP (Unit 1 & 2)29.12.201929.01.2019
49pROCUREMENT OF SPARES TO BTPS26.12.201925.01.2019
50Providing, Erection & Commissioning for 01 no. of Induced Draft, Fan less, Fill less FRP Cooling Tower for U#1 TG Centralized AC system @ BTPS04.01.201904.02.2019
51Round the clock monitoring, Preventive Maintenance, Breakdown Maintenance Ramappanahalla pumps, Ash pond seepage pump, Raw Water pond Toe drain pump installed in BTPS site for a period of One Year.05.01.201905.02.2019
52“Carrying out of Round the Clock Monitoring, Routine, Preventive, Break down maintenance of Air Condition low side equipment’s (except chiller units), ventilation system such as Air washer Units, Fresh Air Supply, Exhaust fan, Roof Extraction Fan System & Comprehensive maintenance of Split Ac’s, window Ac’s, Ductable Ac’s, Packaged Ac’s from 1Tr to 15TR installed in unit 1, 2 & 3 @ BTPS”04.01.201904.02.2019
53Providing, Erection & Commissioning for 01 no. of Induced Draft, Fan less, Fill less FRP Cooling Tower for U#1 TG Centralized AC system @ BTPS04.01.201904.02.2019
54SUPPLY OF SPARES TO RTPS-REG27.12.201807.02.2019
55Procurement of spares to BTPS26.12.201925.01.2019
56Supply of Fasteners for CHP (Unit 1 & 2)29.12.201929.01.2019
57INSTALLATION OF FLUE GAS DESULPHURIZATION SYSTEM AT BTPS UNITS21.12.201820.02.2019