Sl no.TitleIssue Dateclose Date
1NIT pertaining to Bay Control Unit (BCU) based Protection & Control System for all lines/BC & Distributed Bus Bar protection of Kadra, Kodsalli & Almatti Dam Power Houses of KPCL30.07.201828.09.2018
2Procurement of spares to BTPS through e-portal25.07.201816.08.2018
3Providing Chain link fencing & Entrance gate to Ware house No.3 at BTPS.30.07.201828.08.2018
4Patrolling of Maralihalla pipeline from Maralihalla Pump house to BTPS plant for the year 2018-19.30.07.201806.08.2018
5Procurement of spares to BTPS through e-portal25.07.201816.08.2018
6Supply, Erection, Testing and Commissioning of Heavy Duty Roll E Drag cable carrier system in place of conventional Festoon trolley system for Shuttle Conveyor 55B in CHP-2 Binker Area.12.07.201814.08.2018
7Supply, Erection & Commissioning of BFP Local Panels for Unit# 1&2 RTPS, Shaktinagar Raichur (Dist) Karnataka28.07.201828.08.2018
8Supply of Hydrogen, Carbon dioxide & Nitrogen gas(Refilling in KPCL cylinders) and Servicing of Gas cylinders required for maintenance of Generator & its Auxiliaries of 2×500 MW and 1×700 MW Units at BTPS for a period of 1 year(2018-19)25.07.201807.08.2018
9Procurement of spares to BTPS17.07.201821.08.2018
10Procurement of spares to BTPS24.07.201817.08.2018
11Procurement of spares to BTPS through e-portal23.07.201821.08.2018
12Corrigendum-1 for “The work of Operation & Maintenance Contract for 2X800 MW Coal based Yeramarus Thermal Power Station (YTPS) for a period of Thirty (30) months at Chikkasugur, Raichur District, Karnataka State”21.07.201810.08.2018
13TR OIL 162.12 NIT23.07.201824.08.2018
14Maintenance works of 11KV HT kiosk, 11KV / 433Volts compact substation network, colony street lights of BTPS Township as detailed in the scope of work for the year 2018-19 at BTPS21.07.201830.07.2018
15Procurement of CO2 Gas(Annual Rate Contract) for YTPS -e-Tender23.07.201823.08.2018
16Procurement of H2 Gas (Annual Rate Contract) for YTPS -e-Tender21.07.201820.08.2018
17Procurement of Bearing puller & Hydraulic Jack -e-tender19.07.201809.08.2018
18Procurement of Liquor Ammonia Lab Reagent (Annual Rate Contract) for YTPS -e-Tender10.07.201809.08.2018
19Procurement of RO Antiscalant Polymeric (Annual Rate Contract) for YTPS-e-Tender09.07.201809.08.2018
20Enquiry through sealed cover: Procurement of Power tools & Welding Machine18.07.201821.08.2018
21Enquiry through sealed cover: Procurement of Chain Pulley Blocks18.07.201821.08.2018
22Enquiry through sealed cover: Procurement of Spanner Set & other hand tools17.07.201821.08.2018
23Enquiry through sealed cover: Procurement of Measuring Instruments17.07.201821.08.2018
24Enquiry through sealed cover: Procurement of Hand Tools16.07.201821.08.2018
25Enquiry through sealed cover: Procurement of Power Tools & Electrical accessories13.07.201807.08.2018
26Enquiry through sealed cover: Procurement of 1ph welding machine and power tools25.08.201819.12.2018
27Enquiry through sealed cover: Procurement of Gaskets & Rods11.07.201814.08.2018
28Enquiry through sealed cover: Procurement of Chain Pulley Block & Lifting accessories11.07.201814.08.2018
29Enquiry through sealed cover: Procurement of Illumination Materials04.07.201807.08.2018
30Enquiry through sealed cover: Procurement of Ballast & Chokes for HPSV/ MH03.07.201807.08.2018
31e-portal:Procurement of CW Treatment Chemicals(Annual Rate Contract) for YTPS11.07.201809.08.2018
32e-portal:Procurement of RODM Treatment Chemicals (Annual Rate Contract) for YTPS11.07.201809.08.2018
33e-portal:Procurement of Sodium Meta Bisulphite (Annual Rate Contract) for YTPS10.07.201808.08.2018
34e-portal:Procurement of Aluminum Sulphate (Annual Rate Contract) for YTPS10.07.201808.08.2018
35e-portal:Procurement of Hydrochloric Acid (Annual Rate Contract) for YTPS09.07.201807.08.2018
36e-portal:Procurement of Caustic Soda Lye (Annual Rate Contract) for YTPS25.07.201825.08.2018
37E-portal:Procurement of Sulphuric Acid (Annual Rate Contract) for YTPS06.07.201802.08.2018
38Periodical maintenance of Internal, Peripheral roads & drains (excluding CHP area) at BTPS for the year 2018-1919.07.201803.08.2018
39Maintenance & Up keeping of gardens in BTPS for 2018-19 (from Aug-2018 to Mar-2019).19.07.201803.08.2018
40Periodical maintenance of CHP roads & drains at BTPS for the year 2018-1919.07.201804.08.2018
41Procurement of spares to BTPS through e-portal11.07.201809.08.2018
42Procurement of spares to BTPS through e-portal19.07.201820.08.2018
43Annual rate contract for supply of consumables of Printers/Fax machine and Pen drives13.07.201813.08.2018
44"Design, Engineering, Rewinding of all three phases using existing core with change of LV Voltage from 15 KV to 15.75 KV , replacement of 17 taps OLTC to 9 taps OCTC , inspection and testing at works as per IS delivery. Assembly and joint inspection at site of one no. of CGL make-sl no. T-8331, 3 phase, 50 Hz 250MVA, 15.00 KV/420 KV, YNdl, ONAN/ONAF/ODAF Cooled generator transformer along with supply and erection of HV,LV and neutral bushings with new NCT of existing NCT’s rating, supplying of spare bushings one no. each HV,LV & neutral bushings, replacing of WTI for HV and LV winding, OTI , PRD’s Buchholz relay (without cooler bank, including testing of tank and core, to & fro, transportation with loading and unloading at both the ends and Transit insurance etc, required Transformer oil at their works is in contractor’s scope)”-Reg10.07.201810.08.2018
45SUPPLY OF SPARES FOR RTPS- Reg07.07.201816.08.2018
46“Maintenance of various types of lighting fittings and power supply points in Offices, pump house buildings and Road lights & Cable Rectification at RTPS Plant for a period of One Year-Reg11.07.201816.08.2018
47Short term tender for the work of “Maintenance of Illumination System, Power Supply and welding supply points of Unit- 1 to 4, for a period of 12 months.-Reg11.07.201828.07.2018
48Short term tender for the work-“Maintenance of Illumination , Power Supply and welding supply points of Unit- 5 to 8, pump Houses, Street Lights, work shop/Offices & clarifiers for a period of 12 months’’-Reg11.07.201828.07.2018
49Supply, Erection, Testing & Commissioning of Heavy duty Roll E drag chain cable carrier system in place of conventional Festoon trolleY system for Shuttle Conveyor 558 in CHP-Z bunker area-reg11.07.201814.08.2018
50Annual maintenance of station buildings annex and other buildings inside BTPS plant for the year 2018-19 (from Aug-2018 to March 2019)”.11.07.201826.07.2018
51Clearance of jungle in plant area inside BTPS for the year 2018-1911.07.201826.07.2018
52Cutting and removing of Apu/Jondu on upstream side of Weir at Maralihalla Pump House for the year 2018-19.11.07.201826.07.2018
53Annual maintenance of NDCT- 1 & 2 inside BTPS for the year 2018-19.11.07.201826.07.2018
54Clearance of jungle in CHP area inside BTPS for the year 2018-1911.07.201826.07.2018
55SUPPLY OF SPARES TO RTPS-REG28.06.201807.08.2018
56SUPPLY OF SPARES FOR RTPS-Reg18.06.201831.07.2018
57Inspection, testing, certification of lifting tools, tackles and pressure vessels as per factory act at Varahi Hydro Electric Project, Hosangadi, Kundapura Tq, Udupi(D)02.07.201821.07.2018
58Loading, Internal Transportation and Unloading of Coal from Stock Yards at YTPS to ERH-1 & 2.03.07.201810.07.2018
59Periodical special assistance for routine maintenance works of Turbine and Transformer groups for a period of twelve months at VUGPH, Hosangadi, Kundapur Tq, Udupi Dist, Karnataka03.07.201802.08.2018
60RELEASED WASTE OIL WITH BARRELS02.07.201818.07.2018
61Servicing of compressors, blowers, under truck equipment’s and air brake systems of Locomotives for a period of four months02.07.201816.07.2018
62Collection, Loading, Transportation and Unloading of Mill Rejects and Miscellaneous works of Unit -1, 2 & 3 for a period of one year08.06.201806.07.2018
63Housekeeping of Generating station, Pump house ,Control rooms and Allied buildings of Unit-3 at BTPS for the year 2018-19.30.06.201816.07.2018
64Housekeeping of Technical Building at BTPS for the year 2018-19”30.06.201816.07.2018
65Maintenance of Raw water pipeline from Maralihalla pump house to BTPS plant for the year 2018-19.30.06.201816.07.2018
66Housekeeping of Coal Handling Plant (Unit-1 & 2) at BTPS for the year 2018-19”30.06.201816.07.2018
67Providing catering services to corporate executives including house keeping of guest rooms, dormitory, office complexes and their annexes including maintenance of water supply at BTPS.for the year 2018-19.30.06.201816.07.2018
68Procurement of spares to BTPS through e-portal29.06.201819.07.2018

Updated On:02.07.2018 05:34:05