Sl no.TitleIssue Dateclose Date
1Design, Engineering, Supply , Installation, Testing & Commissioning of LTAC & DG/KEB Panels at ODY of VUGPH, Hosangadi, Kundapur(T), Udupi(D)28.02.202013.03.2020
2(English) Supply of Spares to RTPS vide e-Portal25.02.202024.03.2020
3(English) Carrying out Routine/ Preventive and breakdown maintenance works of 415V LT system comprising Switchgear, motors & its associated control panel, Battery banks, EOT cranes/Hoist and cables of Outlying Areas of Unit-1,2&3 at BTPS, Kudathini for a period of 45 days.25.02.202004.03.2020
4(English) Procurement of HSD to YCCPP25.02.202011.03.2020
5(English) Comprehensive Annual Maintenance of PCs & Printers at BTPS for the Year–2020-2124.02.202010.03.2020
6(English) up-gradation of projector at BTPS24.02.202010.03.2020
7(English) Surveying of existing Storm water drain network inside BTPS Plant area, using Total Station24.02.202003.03.2020
8(English) Sale of 30,000MTs Mill Reject Coal (Waste coal)25.02.202002.03.2020
9(English) Housekeeping of coal handling plant buildings of unit 1,2 & 3 for the year 2020-21 at BTPS, Kudithini19.02.202006.03.2020
10(English) Repair of existing Roofsheet,sheet,installation of Airand cove sheet in Cylinder Shed of Ware19.02.202009.03.2020
11(English) Works at BTPS20.02.202002.03.2020
12(English) Works at BTPS20.02.202002.03.2020
13(English) Works at BTPS20.02.202002.03.2020
14(English) Works at BTPS20.02.202002.03.2020
15(English) Works at BTPS20.02.202006.03.2020
16(English) Works at BTPS20.02.202004.03.2020
17Supply , fabrication, installation, testing & commissioning of Cooling Water Header Pipeline for UEB & LEB Oil Coolers of 1st Stage (Unit-1 & 2) BHEL make 115MW Generators “ for Varahi Under Ground Power House, Hosangadi, Kundapur(T), Udupi(D)20.02.202006.03.2020
18(English) Works at BTPS20.02.202005.03.2020
19(English) Providing and Fixing Name Boards to Building/Components of Units inside BTPS Plant,Kuditini Bellary”18.02.202004.03.2020
20(English) PROCUREMENT OF ROTARY CAM SELECTOR SWITCHES FOR YTPS11.02.202011.03.2020
21(English) PROCUREMENT OF COAL PROCESSING EQUIPMENTS19.02.202026.02.2020
22(English) PROCUREMENT OF GRAVIMETRIC FEEDER SPARES FOR YTPS15.02.202016.03.2020
23(English) PROCUREMENT OF LED MODULES FOR MOSAIC CONTROL PANELS AT YTPS17.02.202017.03.2020
24(English) PROCUREMENT OF IMPELLER FOR JOCKEY PUMP17.02.202016.03.2020
25(English) Procurement of SPARES TO RTPS13.02.202014.03.2020
26Brief bid notification-Rewiring of non residential buildings at Hosangdi, Kundapura(T), Udupi(D)17.02.202003.03.2020
27(English) Procurement of spares through btps purchage e-portal18.02.202025.02.2020
28(English) Procurement of spares through btps purchage e-portal18.02.202013.03.2020
29(English) Maintenance of Raw Water Pond, Ash pond and Ramappana halla at BTPS for the year 2020-2118.02.202004.03.2020
30(English) PROCUREMENT OF RUST REMOVING CHEMICALS FOR YTPS11.02.202011.03.2020
31(English) PROCUREMENT OF ROTARY CAM SELECTOR SWITCHES FOR YTPS11.02.202011.03.2020
32Supply of outdoor type 198KV Lightening Arresters for NPH as per enclosed technical specification (make: Birla/ Elpro/ CGL/ ABB/ GE T&D India Ltd./ Siemens/ Oblum/ Lamco/ equivalent)07.02.202006.03.2020
33(English) SHORT TERM TENDER FOR THE WORK-SHIFTING AND REARRANGING OF HYDROGEN AND CO2 GAS CYLINDERS AND HSD FOR THE YEAR 2020-2106.02.202024.02.2020
34(English) procurement of spares through BTPS06.02.202002.03.2020
35(English) procurement of spares through BTPS06.02.202002.03.2020
36(English) procurement of spares through BTPS08.02.202018.02.2020
37Supply, installation, commissioning and testing of control panel for two Penstock gates of Supa Dam.06.02.202018.02.2020
38(English) PROCUREMENT OF SPARES FOR HYDRAULIC SYSTEM OF STACKER CUM RECLAIMER06.02.202006.03.2020
39(English) procurement of spares through BTPS06.02.202024.02.2020
40(English) Procurement of SPARES TO RTPS04.02.202004.03.2020
41Replacement of service mains of residential buildings at Hosangadi, Kundapura(T),Udupi(D)05.02.202020.02.2020
42(English) Procurement of HSD to YCCPP,YELAHANKA, Karnataka.05.02.202020.02.2020
43(English) NOTIFICATION FOR CHANGE IN ADDRESS OF O/o CHIEF ENGINEER(THERMAL DESIGN)04.02.202004.02.2020

ನವೀಕರಿಸಿದ ದಿನಾಂಕ :04.02.2020 05:47:13