+ 100% - Englishಕನ್ನಡ
Menu
Archive

Sl no.TitleIssue Dateclose Date
1(English) Supply, Installation, Commissioning, Training and AMC for four years of finger print biometric systems in KPCL.07.03.201908.04.2019
2(English) Bid document for Supply, Installation and Commissioning with three years warranty for Audio and Visual (AV) Equipment’s at Green building, Bengaluru07.03.201908.04.2019
3Corrigendum II- Design, Build, Operate and Maintain (DBOM) OF 5MW Waste to Energy Project at Bidadi, Ramanagara Dist, Near Bangalore21.03.201917.05.2019
4(English) Physical verification of Coal using Total Station Survey Instrument in Coal Stock Yard at BTPS08.02.201907.03.2019
5(English) Design, Manufacturing, Supply, Erection & Commissioning of 20MT Double Girder EOT Crane For Mill Service Shop at BTPS – Extension of last date for submission of bids15.02.201917.04.2019
6(English) Rectification, alignment and re-commissioning of wagon tippler – 216.03.201925.03.2019
7(English) Installation of Flue Gas Desulphurization system for 2 x 800MW, units-1 and 2 of Yeramarus Thermal Power Station of RPCL, Yeramarus, Raichur District, Karnataka.09.03.201910.06.2019
8(English) Installation of Flue Gas Desulphurization system for 7 X 210MW, units 1 to 7 and 1 X 250 MW, Unit 8 of Raichur Thermal Power Station of KPCL, Shakthinagar, Raichur District, Karnataka09.03.201917.06.2019
9(English) Repair/ Rewinding Of CGL Make, 3 Phase, 415 Volts, 150 KW Squirrel cage induction motor with serial no NADZ9361509.03.201905.04.2019
10(English) Supply, erection, testing & commissioning of 700 Nos. of 230Wp Solar PV modules at 3 MW Solar PV Plant, Itnal Village, Chikkodi Taluk, Belagavi District09.03.201910.04.2019
11(English) Procurement of spares to BTPS11.03.201911.04.2019
12(English) Providing Housekeeping services to KPCL Offices at Shakthi Bhavana, Sudarshan Complex & Trade Centre at Bengaluru.06.03.201921.03.2019
13(English) Procurement of spares through btps purchage.08.03.201908.04.2019
14(English) Procurement of spares to BTPS07.03.201926.03.2019
15(English) Clearance of jungle in CHP area inside BTPS for the year 2019-20.06.03.201906.04.2019
16(English) Clearance of jungle in plant area inside BTPS for the year 2019-20.06.03.201908.04.2019
17(English) Renovation of existing toilets in Unit-1 & 2 Powerhouse and ESP control rooms at BTPS”07.03.201915.03.2019
18(English) Construction of Security room in North gate road entrance inside BTPS07.03.201918.03.2019
19(English) Annual maintenance of NDCT- 1,2 & 3 inside BTPS for the year 2019-20.07.03.201918.03.2019
20(English) Providing & Supplying flanges & Dummy plates to Manholes of Maralihalla pipeline07.03.201908.04.2019
21(English) Procurement of spares to BTPS tnrough e-portal07.03.201908.04.2019
22(English) Rectification, alignment and re-commissioning of wagon tippler – 208.03.201915.03.2019
23(English) SUPPLY OF SPARES TO RTPS VIDE E-PORTAL-REG06.03.201911.04.2019
24(English) Providing Security services of Ex-Servicemen / Civil Security Guards without arms including Ex-Servicemen Supervisor and Computer Operator for 1x 370 MW Yelahanka Combined Cycle Power Plant, Yelahanka, Bengaluru for a period of 12 calendar months.05.03.201925.03.2019
25Two types of scrap vehicles, Maruthi Zen car and TATA 407 are available at KPCL store yard of Varahi Hydro Electric Project, Hosangadi for sale through tender cum auction.07.03.201906.04.2019
26(English) Supply of one number of 15MVA, 11/66kV, 3 Phase, Generator Transformer for River Bed Unit-1 of Bhadra Hydro Electric Power House26.02.201929.04.2019
27(English) Repair of failed +24VDC and +48 VDC power supply modules of U#4 TG DDC system05.03.201905.04.2019
28(English) Enquiry: Procurement of Silica Gel for YTPS25.02.201927.03.2019
29(English) Enquiry: Procurement of Electric Oven for silica gel for YTPS25.02.201927.03.2019
30(English) E-tender: Procurement of CPVC Pipes and Fittings for YTPS27.02.201927.03.2019
31Replacement/rectification of Unit-3 & 4 Turbine runner aeration cones at Nagjhari Power House02.03.201912.03.2019
32(English) Supply, Erection, and commissioning for 01 no of fan less, spray jet fill less cooling tower for unit 7 AC system at RTPS02.03.201919.03.2019
33Replacement of 2150mm Rotary valve main seal of Unit-4 at Nagjhari Power House02.03.201912.03.2019
34(English) Re-Tubing of 1 No. of spare Air cooler for 115MW Hydro generator with buy back of released tubes at VUGPH, Hosangadi, Kundapura(T), Udupi(D)02.03.201918.03.2019
35(English) SUPPLY, ERECTION, TESTING & COMMISSIONING OF SWITCHYARD EQUIPMENTS FOR 220KV AND 400KV SWITCHYARD OF RAICHUR THERMAL POWER STATION.01.03.201930.04.2019
36Matching work of spare slip ring assembly (collector assembly) of Sharavathy Generating Station, Jogfalls-577435, Shimoga – Dist, Karnataka.27.02.201914.03.2019
37(English) Installation of Zero liquid Discharge System at 1 X 370MW YCCPP,yelahanka, Bangalore27.02.201912.04.2019

ನವೀಕರಿಸಿದ ದಿನಾಂಕ :01.03.2019 09:00:05
ನವೀಕರಣ ಮಾಡಿದವರು :CETD